How to find quantity of cement bags, sand, coarse aggregate, from 1m3 of concrete of m20 design?
Answer Posted / z.m mughal
M20 = 1:1½:3
Wet concrete = 1 cum
To convert wet to dry material of concrete, we multiply 1.54. (Note 1.54 is for concrete but if we calculate dry material of mortar, we will multiply 1.27)
1*1.54=1.54 cum (dry material)
Formula of material is
Ratio/sum of ratio * total material quantity
Sum of ratio = 1 1½ 3 = 5.5
Total material quantity = 1.54 cum
Cement, 1/5.5 * 1.54 = 0.28 cum
0.28/0.0354 = 7.909 bags , say 8 bags
(Note: 0.0354 is volume of 50kg cement bag in cum and 1.25 in cft).
Sand or fine aggregate, 1.5/5.5 * 1.54 = 0.42 cum
Coarse aggregate, 3/5.5 * 1.54 = 0.84 cum.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.
How many days should curing of plastering, brick work and concrete
What is meant by a context menu in a cad software?
how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?
Howmuch bend to be provide for 200/600 BEEM
Define aligned dimension?
Are you ready to relocate with your immediate family to United States as a new employee?
water leak detection system question & answer
What are the basic use of runners and standards of pipelines?
what is flexible and rigid footing?
What is passive earth pressure ?
Curvature ki quantity kaise nikalte hai pls give me ans... curvature canal ka hai
what is parametre for M25 after 7 days strength
what is the difference between np2 and np3 concrete mix
within an emergency scenario what are the safe systems of work a coss can setup as part of is duties