How to find quantity of cement bags, sand, coarse aggregate, from 1m3 of concrete of m20 design?
Answer Posted / banti kumar
The dry volume of concrete is 15.2 for 10m³ of concrete.
The ratio of M20 is 1:1½:3
Therefore 1+1½+3 =5.5
Now 15.2÷5.5=2.76 say 2.8cum
Sand =2.8×1½=4.8 cum
Coarse aggregate=2.8×3=8.4cum
No of cement bags =2.8÷0.035=80 bags(10m3)
Therefore for 1m3 80÷10= 8 bags.
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6
Detection of a beam & a girder areββββ
cement and sand required for one block of size 0.23*0.15*0.46
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
How to take labor charges for construction of 1cum of concrete?
Rate analysis of Vitrified tile in cement mortor 1:3
Define block?
I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.
What will be weight of 0.5mm GI sheet per sq.ft?
What should be the standard roof height like to be?
What is the primary difference between adsorption and absorption?
Define polar co ordinates.
difference between trapezoidal and pedestal footing and how the load acts on that
can any one tell me in detail footing estimation .. i am new here in dubai so facing lots of problem...
Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards