brick work 1cum kitne cft hote hai

Answer Posted / ishfaq

35.315

Is This Answer Correct ?    7 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how many shuttering material required for 1000 sq.m built up area.

1879


Required amount of Steel bars, cement/ square feet for roofing of residential building upto 3rd floor.

1260


Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.

1777


what r you reqired for concrete baching plant?

1907


Curvature ki quantity kaise nikalte hai pls give me ans... curvature canal ka hai

2585






What is standard Sand? What is Regime condition? What do you mean by the core trench in Earthen Dasm? What is soundness test for cement? When negetive shear force takes place in a R.C.C member?

1961


how to read the drawings to find the quantity of steel in a storm water manhole or any other structure?

2140


Mention different types of roof systems?

730


what is the criteria for the finalisation of pavement thickness in road project?

1591


how to calculate load for a bungalow and 1column carry how much load if the size of column ,9"*15" .....or total structure load......

1425


If 40 backlogs are cleared m finally with 65 percent marks . Am I eligible to get visa to US

1296


weight of 1 cft 10mm, 20mm, 40mm aggregate weight of 1cft course sand

4583


what is tension column?

1556


what is the cost difference of a same structure when it is constructed with brick masonary and when it is constructed with block masonary and concrete as a frame structure????????????????????????

1630


What is the material consumption- cement,sand,tiles etc for Toilet dado?

7054