What is the difference between vitrified and ceramic tiles?

Answer Posted / naveen s bhat

Ceramic tiles are made of clay and mixed with water, vitrified tiles are made of clay mixed with quartz and feldspar.
These elements make vitrified tiles more stronger than ceramic tiles and less water absorptive which makes them better for outdoor use.

Is This Answer Correct ?    6 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags

2025


how to diffenentiate the fixed beam and simply supported beam in the execution while reading the drawing and how the reinforcement detail will be differ for the above.

1968


i have boiler of 35 tone and wanted dig out foundation is there any body to help me to carry out calculation for the foundation like

1551


how to calculate spacing rod in column

1434


punj loyed and sapurjl palanjl

1885






What is meaning of tlc

1600


How to calculate the quantity of cement mortar 2" for mosaic tile fixing 12"x12"?

1249


If we have the center line of the Finnish road level and we want to know what level of pay would have offset the Lhs and Rhus RHS 1,2.5,5 1,2.5,5 m.

1546


What in bending moment, if a moment is free end of cantilever beam?

716


i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible. 

1415


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

1677


can any one explain bar bending schedule of bems and columns and slabs ??

1414


How to calculate Volume of Wet cement concrete for a specific grade?

1774


What was asked in isro civil interview

501


very simple or less time consuming formula for reinforcement calculation by moment

1050