1 TPH how many Megawatt ?

Answer Posted / pkrathi2007@gmail.com

Depends upon the type of turbine . Whether it back pressure or condensing type.
If it is back pressure and inlet steam pressure is 45 kg and temp is 440 degree. Then 1tph will be approx 0.125 Mw.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what's the moog valve

1061


what is natural frequency of turbine shaft .

1735


How We Calibrate the vaccum transmitter?

1473


can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525

1284


By any way can we increase the B check hours from 300 to 500

1701






what is the meaning of SST300 V56A in SIEMENS turbine

3890


How to calculate power press toneage

1565


explain how the third harmonic content of the magnetising current affects transformer design

2777


what is the basic use of power plant in equipment

1233


can dp type level transmitter work in under vaccum condition

1547


What is LB-SR.

2491


Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.

2990


Why superheated are started before I'd and rd fan?

1700


DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.

520


Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon

1777