How much overlaping required for welding the
reinforcement bars in Columns & beams

Answer Posted / arindam

10 times the dia of bar
Ex : 20 dia of bar, so 10 *20 : 200 mm lap while welding

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?

10193


can we find any technical issue if we are gong to change the dimensions of steel beams from one type to another type IE if there are any equievelant data base to find solution for problem of changeing sectios of beam from one type to another with the same cross sectional area.

1580


What is the release of lien?

689


what energized you to complete your course?

1876


I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

1638






Maximum cement content in 1cum for RCC and PSC? (please give IS,IRC referance?

1720


What are the Types Of DPC and its Thickness used?

945


Formula of area of crane hook

1519


What are the alternate material for steel, Sand and aggregate

1826


What is the bowing depth after stressing of PSC Girder of various spans and various dia of strands?

1808


Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.

2362


for 200 kg of cement how is the mix proportion in kg for m25 grade of concrete

1473


On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??

2841


WHAT DLC DESIGN IN CONSTRUCTION

1644


What are the basic use of runners and standards of pipelines?

674