Answer Posted / nani
wet sand 1920 kg/m3
| Is This Answer Correct ? | 4 Yes | 2 No |
Post New Answer View All Answers
what is work of planning deptt. in any construction compny (in road project)
How does a traffic light signal work ?
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
Explain what are the skills required to become an architect?
how calucate cement sand ratio for plstering
what is kribs is supporting?
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
how to caluclate sienerge qty in construction in ap
What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)
how to absorb to site basic corrections? which are the important correction?
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
where can i get the previous question papers for rrb section enginerr (civil)
For Wet Mix Mecadam design what is Optimum moisture content
pls give me some basic informations in construction of a structure?
Hollow block masonry in cement mortar 1:4, 40×20×20cms in superstructure take 10sqm.I want calculation of brick sand