1 Cubic Meter = 487 Modular Brick, 1 Cubic Meter = 494 Non
Modular Brick, (As per Rate Analysis DSR 2012 Vol.-1)what is
the Brick Size ?
1 Cubic Feet = 13 Modular Brick, 1 Cubic Feet = 17 Non
Modular Brick. what is the Brick Size ?

Answer Posted / nikhil

Modular Brick Size = 190 x 90 x 90 mm
With addition of plaster it counted as 200 x 100 x 100 mm
For 1 Cum :-
1 brick quantity including plaster (in CuM)
= 0.2 x 0.1 x 0.1 m
= 0.002 CuM
Total bricks in 1 CuM = 1/ 0.002
= 500 Nos.

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

i have boiler of 35 tone and wanted dig out foundation is there any body to help me to carry out calculation for the foundation like

1551


What are the different approaches in designing the floors of the service reservoirs?

767


Why concrete barriers have curved surface profiles?

802


What is the different type of slump test indications?

674


Need help in designing a degasser tower for 2m3/hr DM plant, also send me the formulae used

4283






What is absolute coordinates?

703


How to take labor charges for construction of 1cum of concrete?

688


1. For 10sq.m area(47 kg bitumen contain) of 45 mm thick bitumen mix layer..how much bitumen is required for 1600 sq.m and how much aggregate need for that ?? 2. And much tonnage of bitumen mix required for 10 sq.m area of 45 mm thick. Please give answer...

1637


IN Compression testing machine 1division =10KN ,then what is compressive strength of 100*100 mm cubes at a load of 320 KN

1375


I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.

1767


sir how can we find the cement and sand required for making 4" drop

1651


what is the sequence of the activities in the typical under ground water tank including civil & MEP works.

1962


What is thumb rule for deep trench excavation

1325


if the nitrates more than 45mg/l in water lead to disease then what is it called

2344


factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard

1669