how do we calculate the quantity cement,sand, & aggregate
for M20,M15 for 10cum.

Answer Posted / sanket bagade

a) For 1 m3 of concrete Mix 1:2:4 (M15)
Add 50% for wet concrete = 1.50 m3
= 1.50/(1+2+4) = 0.214 m3
For 1 m3 = 30 bags of cement required (1440/50) say 30 bags
Cement = 0.214 x 30 = 6.42 bags
Sand = 0.214 x 2 = 0.428 m3
Aggregate = 0.214 x 4 = 0.856 m3

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how much tempareture are required to make liquid state of pid leed

1718


plz.show development and anchorage length in simple diagram.

2105


WHAT IS THE MAIN DIFFERENCE B/W HIGHWAYS AND MOTERWAYS?

1942


mean of NH4 pipe

2117


How to get MEP technical,instaaltion & testing data for interview?

1612






HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS

4227


what is the use of water bar in water tank and is this an extra item in estimate?

2124


how to calculate the material from ratio of work PCC, RRM,POINTING, RCC

1891


pls tell me , what is the water content

1674


List out some of the software program that can be useful for architect?

683


what is difference between GTS bench mark and temporary bench mark

3964


Define What is aggregate?

704


How to find permissible diagonal tensile stress in reinforced brick work

2085


In a beam,stirrups are placed closely at ends than at centre due to shear.similarly where would ties be closer to each other-at center or at ends in a column and slab.

2860


Name the main components of a cad gui?

1042