1) One mason per day how many cu.m work will do as per list
given a) Brick work,hollow brick work and cc block work and
plastering how many m2 per day 2) one carpenter per day how
many m2 will do as well as scaffolding how many m3

Answer Posted / jarrar siddique

1. Brick work in cement mortar in foundation and plinth 1.25cum (45cuft)per mason/day, or 600 Bricks/day minimum.

2. 12mm (1/2) plastering with cement mortar 8.00sqm (80sqft)per mason/day.

3. Supplying, fitting, fixing and removing shuttering & staging 7sqm/carpentar/day.

Is This Answer Correct ?    77 Yes 8 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght

968


what is the coefficient for running feet to cft coversion both area and price

1928


What is the difference between Grade I, II and III of GSB?

1895


what is the sequence of the activities in the typical under ground water tank including civil & MEP works.

1958


Dear Frds, How can i calculate the Steel for RCC Slab, Please provide one Example also, so that i can understand very well. Ex: Area: 1320.0 Sft.(44' X 30') Span: 15'(Default). Column Size: 9"X15"(6 No.s 12mm Rods) Please Provide Calculation Details. Thankyou. Satish

2092






List out some of the software program that can be useful for architect?

677


how to calculate the dry wt of sand and cement for a required design mix?for ex:M20

2111


There are two buildings one taller and one shorter whose time period will be grater and similarly the frequency ?

978


Howmuch bend to be provide for 200/600 BEEM

1207


how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm

1542


How much cement,sand,bricks and water needed for 1square metre brick work?

1338


Can we use concrete of slump cone in cube casting in which we have already measured slump?

1263


Define What does civil status mean?

750


How to calculate the cement consumption in RR Masonry in CM 1:8 for the foundation of Ground Level Reservoir

1034


quantity of sand and cement for 10m2 plastering 10mm thick for the ratio of 1:4,1:3and its leabour data

2741