what isIS code no for preparation of BAR BENDING SHEDULE (BBS)
Answer Posted / pandiyan
IS 2502
Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
What is the method of soil replacement test?
what is raft foundation
What is absolute pressure? How absolute pressure is calculated?
Slump Values for works?
What is absolute coordinates?
how do we design mix ratio?
how many re use can use shutting material. timber ? ply? steel? plastic? fibre? aluminium? Doka?
what is pile and deam foundation
What is meant by Crystal Concrete?
57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11
in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft
What are the advantages and disadvantages of using plastic and timber fenders?
What is Critical path in Ms-Project ?
For The preparation of goverment examination Which book i will prefer and by which way i will do the preparation for exam.
how much cement and sand required for 1cum rr masonry