what is the ratio of M10,M20,M30,M40,M50,M60 grade concrete
Answer Posted / rajesh t.
Two Way RCC slab
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
What are the different types of foundation?
How do you compute the volume of airflow?
Why are the bolts that hold steel rails together in oval holes?
Define What happens to Load at yielding ?
for G+2 residential building how much quantity of required in foundations,sub & superstructures per sq ft area
I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item
how much need sand and cement for 1 cft roof construction?
CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL
how many BSCs can i connect to the HUAWEI MSC
When was the first motorway built in england?
What is M40 _ TOR - EQ and B.F.S
What are the steps involved in the concreting process?
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?