How much depth of excavation have to do for Highrised builldings?if Raft foundation how much,and Pile foundation how much?
Answer Posted / kabir
for raft foundation depth of exacavation is nearly about
3.0m . because due to having the raft foundaton their will be provision of basement in that structre ..........
Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?
What type of tensile strength is handling by crank in beam? Thanks.
How can I make justification between using concrete grade c35 compare c37?
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.
whats is difference between anchorage length and development length
What is thumb rule in quantity and cost estimation of a residential building in civil engineering??
how to do cementicious paint for rcc walls of cw pump house
Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40
what is the weight of 12mm aggregates?
How do you prepare Material Recovery Statement for deduction from contractors bills?
what is the list of building construction equipment & teir output?
strength of bitumen concrete with 80-100 & 60-70 grade bitumen
For the construction project what capital cost has to be taken in consideration?