How will we calculate the number of cement bags in 6 foot by 6
foot footing?
Answer Posted / pavan
6 Foot * 6 foot* 6 foot ,first convert in to mts
1 foot = 0.3048 mts
so 6 foot = 0.3048*6= 1.828 mts
so 1.828*1.828*1.828=6.11 Cum
according to mix design or nominal mix cement content will be provided per cum.
example if min cement content is 380 kg/cum for m30 grade
6.11 * 380 =2321.80
or 2321/50 = 46.36 bags
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
How many days should curing of plastering, brick work and concrete
What is semirigid connections?
how i convert mm into standard wire guage (SWG)no.
How to calculate paint drums per meter square
Explain what is alternate bid?
Dear sir, i want to NBCC & NTPC previous exam papers email Id : madhu_bingi@yahoo.co.in
What is geopolymer based concrete?
how to calculate testing date
How to marking the building
Define mirror?
What goals do you have in your career?
Requirement of cement, and steel 1:2:4 ratio concrete in 1128 Sqft area(Cement No of bags, steel in Kgs)
Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.
How to use of me trial wall plaster 6mm , 10mm par sqm. use in sand and cement ?
if we know load bearing capacity of the soil and building load falling in each footing, then how to choose the type of foundation??? and if it is shallow foundation then which type of shallow foundation should be choosen i.e either strip or isolated or raft or combined or cantilever footing???????