Answer Posted / rufus
1 in 36
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
What is difference between code and standard and specification?
what is the painting co efficient of slope roof tiles?
What are the Types Of DPC and its Thickness used?
hai, kindly send anyone for output workers format details for construction project in foundation to finishing.
length where bent up is made in slab of bridge from one end
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
what pressure the NP2 class RCC pipe can sustain?
WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?
how much shouid be the rate for ready mix concrete per cubic meter
For plate load test why we are applying pressure 3 times the proposed allowable bearing pressure? Is there any supporting standards for this?
can i get hindi version of is codes based on civil engineering?
What is absolute coordinates?
do we consider shrinkage factor for calculating cement consumption for CM mixes for different works?
what is cross hair cursor?
how to calclate the SHUTTERING TAKEN CONCRETE LOAD? WHAT IS THE LOAD BEARING CAPACITY IN STEEL SHUTTERING PLATE? WHAT IS THE CONCRETE LOAD IN (MASS) IN THE SHUTTERING PLATE. PLATE SIZE IS 120CM* 90CM CONCRETE WALL LENGTH IS 10M ,WIDE IS 60CM, HEIGHT IS 1.2M PLS TO SENT THE CALCULATION.