Answer Posted / rana
Temporary bench mark
| Is This Answer Correct ? | 18 Yes | 2 No |
Post New Answer View All Answers
what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982
Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings
pls tell me about method of cutting length of ties column
for Precast foundation howmany days required we can shift the foundation with american Standards i need reference with section any body can help
HOW MANY BAGS OF CEMEMT USED IN PER M2 OF PARTITION WALL
trapozidal
Is there the dry coefficient of cement is constant?
what is derating factor in cable? what does it mean if derating factor is high/low in terms of thermal resistivity of soil?
Explain what is the difference between built area and super built up area?
How many % we consider for lap for reinforcement for estimates
How to cal. The weight of hollow pipe?
I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item
Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever
How to calculate ventonite bag in pile ( pile depth 25 m dia 1m)
a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.