Answer Posted / r satya nagendra babu
stage - 01 fixing of boundries,
STAGE - 02 Layouting,
Stage - 03 Marking the footing for excavation,
Stage - 04 sub structure,( footing =s and columns uo to plinth beam )
Stage - 05 Super stucture ( Plinth beam to Slab ie,,,which is above the plinth beam )
Stage - 06 Finishings,( Brick work Plasting Painting And All other activites)
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Describe the various methods of concrete curing?
what is directivity effect?
Can inverted beams used in pipes during construction? If yes, explain how it can be implemented?
A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
Define What glue is least sticky?
Can you pl explain the procedure steps of singly and doubly reinforced beams in limit state method
What are the techniques to measure road difference?
Dear sir, i want to NBCC & NTPC previous exam papers email Id : madhu_bingi@yahoo.co.in
How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)
hi, i am doing my B.tech third year and i want to have a job in Genpact...So can you help me which kind of job would be more appropriate for me in such a company and How should i prepare for an interview?
For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.
what is concrete canvas?
i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?
How much quantity water should be placed in one cubic meter area?