what is the least-count of plane-
table,dumpy,theodolite,compass,tachometer?

Answer Posted / yogesh naik

height of building can be measure by ?

techeometer

Is This Answer Correct ?    115 Yes 12 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the wall thickness of NP-3&NP-4 hume pipe as per I.S code

1618


Why Should Curing Not Be Done By Ponding And Polythene Sheets?

779


Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.

703


In a beam,stirrups are placed closely at ends than at centre due to shear.similarly where would ties be closer to each other-at center or at ends in a column and slab.

2860


What is the outturn of Ceiling plastering

2860






Calculation of curtain wall of box culvert

5320


Why steel rods are produced only in even dimensions?

2163


Explain what is progress payment?

717


Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.

2370


how to calculate reinforcment in staircase cranked beam?

2192


what is the service corridor?

1920


How to hide dimensions in autocad?

641


if size is 235cmsx15cmx100cms so how many cement bags and how many sand bags are used for concrete mix

1508


Explain moment of inertia?

649


How do You Maintain a structure after getting cube test of low strength.

1831