what is the least-count of plane-
table,dumpy,theodolite,compass,tachometer?
Answer Posted / yogesh naik
height of building can be measure by ?
techeometer
Is This Answer Correct ? | 115 Yes | 12 No |
Post New Answer View All Answers
What is the wall thickness of NP-3&NP-4 hume pipe as per I.S code
Why Should Curing Not Be Done By Ponding And Polythene Sheets?
Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.
In a beam,stirrups are placed closely at ends than at centre due to shear.similarly where would ties be closer to each other-at center or at ends in a column and slab.
What is the outturn of Ceiling plastering
Calculation of curtain wall of box culvert
Why steel rods are produced only in even dimensions?
Explain what is progress payment?
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
how to calculate reinforcment in staircase cranked beam?
what is the service corridor?
How to hide dimensions in autocad?
if size is 235cmsx15cmx100cms so how many cement bags and how many sand bags are used for concrete mix
Explain moment of inertia?
How do You Maintain a structure after getting cube test of low strength.