Answer Posted / pepepy
Contract demand is the demand where we are making contract with government that we will not cross the value of contract demand.
Maximum demand is the demand where we are utilizing the electricity maximum on a particular time period.
Is This Answer Correct ? | 10 Yes | 0 No |
Post New Answer View All Answers
List few applications of d.c series motor?
The transmission does not have options: a)Partition noise b) Flicker noise c) resistance d) Short noise and reason
what is the grounding Calculation formula? spouse i want to provide grounding to 3phase 18kw motor or i want to provide ground to 3phase 10kva dry type transformere or you give me any exemple...... Thanks.
What is the formula to calculate distribution transformer De-rating on iron losses basis
i need previous entrence exam papers of nhpc.
what is the maximim current drawn by 1 phase and three phase welding machine
R=*ΒΆ l/a
Whats the minimum value for I.R. that can be allowed for HT & LT alternators for operation?
What the difference between ac and dc inductor an capacitor
SUTIABLE FOR ohm's law super conductor
what is meant by tranformer impedance?
Draw a 230kv two-bus bar system showing the following. 1.Two generators (150MW) each connected through one 15.75/230KV transformers 2. 1 outgoing lines 3. Two 230/130 KV transformers 4. BUS PT's 5. CT
what is difference between earthingpits,earthing grid & earthing mess?
in my working site. momentary jerck in electrical supply ocurred frequently which cause of multiple losses in our electrical equipements. how can we protect our electrical machines and equipements in this situation.
Incoming line 11kv And transformer capacity is 2500kva. Consumption load is 1300A. Then fuse capacity is 11kv line.