Answer Posted / satyanarayana
generally lt winding is placed next to core so it is very difficult to tap the winding and hv winding is outside so we can easily make tappings
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Is it possible to measure the voltage of a battery from a single terminal?
what are factors to be consider in electrical installation like load factor,diversity factor .....
what is the prinsiple of dc motor and construction and working ,application of dc motor.
What is the rating of a circuit breaker needed for 300 kv load in 33KV supply line of 33/415 transformer ? Whether 800/1200 amp vaccum circuit breaker can perform for a 33 KV line in input in 415 volt in output of the transformer ?
How to calibrate or test an LT Air Circuit breaker 440 volts, 35 KA, 800 Amps ?
why does the magnetic balance tests at transformer?
While performing stability test of differintial cts how to know the voltage and current on both side of the transformer?
which mm cable should be used for 1.hp immersible pump motor for the distance of 330 metres?
how hazordious area is classified at an oil & gas plant and categorise suitable class of electric equipment in that area like induction motors, LCS, Lighting Fixtures Fluerescent/Flood lights Mercury& sodium lights, J.Bs, Power Cables etc
Do Phase angle measurement have any application in freq/harmonics measurement? If so how?
If a current -8+6sin6t is flowing three ammeter, one is a centre zero PMMC meter, one is true rms meter and one is moving iron meter. What are the reading of these three meter respectively?
diff b/w normal grounding and resistance grounding
what is the effect of connecting three phase supply lines to three phase auto transformer output terminals through a fuse of 10Amp and a circuit breaker (MCB). Is this connection permanently destroy the transformer?
The ripple frequency in output of fullwave bridge rectifier is a. Half the input b. Twice the input c. Same as input
why do you add the load short circuit impedance when considering short circuit amperage. It seems that you should only consider supply. If you need to consider loads and you don't know what loads are to be added , what would be a good sub-transient reactance rating for the loads?