how to calculate the quantity of steel used for construction..
Answer Posted / rajeshkerai
Normally the steel used for the construction is calculated from the bending schedule provided with the structural drawings. if not, than it will have to be measured from the drawings. for each and every members.
Eg: If a beam of 6m long and uses 6nos 16mm reinforcement then it will be
6x6= 36m x 1.58(weight of a 16mm bar/ 1m length)= 56.80kg
if the beam is continuous than we will have to add up laps (normaly 50 x the diameter of steel).
Is This Answer Correct ? | 11 Yes | 3 No |
Post New Answer View All Answers
WHAT IS YOUR CURRENT SALARY
what is pouring and explain
Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????
Explain what is Hybrid Foundation?
What is standard Sand? What is Regime condition? What do you mean by the core trench in Earthen Dasm? What is soundness test for cement? When negetive shear force takes place in a R.C.C member?
What is alternate bid?
calculate the quantity of cement ,sand,bars and aggregate used for 28*4 ft with 4 inch (125mm) thick
1.what is the mix proportion for cement soil compressed earth blocks? 2.how to calculate the mix proportion for cement stablised earth soil blocks?
if dia of inner circle is 42 m and depth is 1.5 m and width is 1 m ,then whait is the quantity of steel?
cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate
for 200 kg of cement how is the mix proportion in kg for m25 grade of concrete
Which tests are performed on soil to decide the type of foundation to be provided.
what is idealized curve for concrere and steel
Why do you want to work here
what is density of 20mm coarse aggregate.plz send answer my below adress e.mail