how to find the electricity cost per m3 in ready mix concert plant?

Answer Posted / fred

Let us say:
Electricity unit=kwh
Cost = USD/m3
Assuming:
Your Mixing Concrete Plant can produce 100m3 in 1hrs and the consumption electricity is 10 kwh, the cost per kwh is 10 USD.

Therefore:
100 m3/hr = 100 USD

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is process planning?

689


How does pressure transmitter electronics sensor be used to transmit level measurement parameter?

1177


why data registers are needed in PLC ?

2216


On what bases time study methods can be calculated?

603


how do you check pump impeller back clearance?

3418






plz send me l&t auestion papers. i have been called for written and interview industrial automation 2 yrs exper. send me on mail pal_deepak06@yahoo.com

1872


state the care that shall be taken while checking the diode

2288


Difine the process you would establish to monitor the effectiveness of an emergency evacuation system

1936


What is producer for anti-collision protection for dumer 220ton in minse?

597


I have 200kg weight cylinder,I want to rotate,but i don't know what is torque of cylinder and what's size of motor for rotate the cylinder.i want to know calculations find out torque of cylinder.

2169


start-up procedure of a centrifugal compressor

2952


how could you change gas line control valve to liquid line valve?

1794


Which two groups of management manages the control organization and what are their responsibilities?

652


What is the major difference between Normal control loop and Cascade control loop and when to use cascade control loop?

2930


What is autofacturing?

647