Answer Posted / aijaz mirza
If we are taking block size (20x20x40)then, 1/.4+.01=2.43
2.43/.2+.01=11.57~12 blocks
Where .01 mortar in mm
.4 is length of block
.2 depth of block
Now for 15 cum area will cover by 12x15=180 blocks
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
1.Fe500 and Fe550 having more yield strength than Fe415.But why are we prefering Fe415.? 2. d^2/162 formula for knowing the steel wt/m apply all these three? Thanks.
how we calculate the grade of the Bituminous materials.?????
How to plan a project
acceptance criteria for concrete works
is basic cost of the material includes tax?
What is demising walls?
how u design STAGING for Superstructure in BRIDGE construction?
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
what is the proper procedure in conducting a california bearing ratio penetration test on soil on cbr machine?
why is M30 grade Concrete use for Foothing & Column M50
Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards
How to find coloumn vertical cut length floor to floor & lap + bend or anything plz clearfiy
What out turn civil works
a concrete mix 1 2 4 by volume with water cement ratio as .6 by weight if moisture content in F.A is 6% with 20% BULKING AND IN C.A 1.5% by volume. find quantities of different materials required for one bag of cement
a rectangle grill of length 72 inch x 20 inch width.how to calculate bar spacing ,bar consist 8 mm thickness and spacing of bar is 2 inch.. calculate no of bar with formula