Answer Posted / suresh bariya
Should be at least 10 days.
Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
how much quantity of cement,sand and water required for 1 sq feet flooring work .
How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
How to calculate carrying capacity of the existing water supply trunkmain
how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you
how to calculate the length diamond shaped striupps in column
During reclamation how can the occurrence of mud waves can be rectified?
Define What is passive earth pressure ?
How many lbs are there in a yard?
i have span of 6m x 4m how do i calculate the reinforcement of steel i needed and to at what distance and also the thickness of slab. looking forward thank you RAVI
Any strength is a stress but any stress is not strength
How will you Engage Labours on Site?
Wats the formula of eccentric footing and how was calculated from concrete qty
how to determine the correctness of proportion used in cement mortor and various IS codes to determine the same?
What is an ice dam sock?
Gidc technical que paper