why not maintain Ph 7.0 in Boiler because 7 Ph is not acidic and not basic.
Answer Posted / alok bhattacharya
We need to mix scavenger in feed water in order to make it oxygen free which helps boiler from corrosion. Phosphate dozing is primarily done for this purpose and this raises PH value and usually maintained around 9. Moreover phosphate dozing helps to make magnetite layer which inhibit corrosion.
Acidic water is prohibitive in boiler for above reason, i.e.
Ph below 7.
Thanks
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
How to calculate power press toneage
Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.
can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525
dear sir i have completed one year post diploma certificate in thermal power engineering from national power training institute durgapur ...plz suggest me for power sector job
DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.
why airtel use + 24 volts and other operators use -48 volt
what is the meaning of SST300 V56A in SIEMENS turbine
what is the basic use of power plant in equipment
Which will have more strain energy 1.Spring 2.Circular disc 3.Solid square plate.
what is the difference between compensated & normal drum level in boiler drum?
By any way can we increase the B check hours from 300 to 500
some one can tell me how residual type excitation is provided through transformers to an AC generator without any battery or PMG&excitor
explain how the third harmonic content of the magnetising current affects transformer design
How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.
LAPT working in alternator / generator