Answer Posted / rajesh kumar jha
230*115*70
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is the exception critarea of cube?
why we create short columns under grade slab?
what is relation between SPT N value and driving piles after conducting a soil test?
What is c.g.i sheet which used for roof??
What is meant by solid geometry?
what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.
How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?
"how can we find the approximate quantity of materials using in a building or total Expenditure in percentage for rough estimate after known the construction area(sqm)".please if you know something about that please post the answer.
Can we apply curing compound on ceiling (slab Bottom)
what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)
Define block?
What is thumb rule in quantity and cost estimation of a residential building in civil engineering??
How much quantity water should be placed in one cubic meter area?
how do you calaculate the total steel quantity of an rcc building using thumb rule?
What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m