How many bags required for 1cum grouting?
Answer Posted / sanjay kale
88.8 bags required for considering density of GP 2 Conbestra is 2220 kg / Cum
| Is This Answer Correct ? | 63 Yes | 5 No |
Post New Answer View All Answers
Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
Describe a time when you anticipated potential problems and developed Preventive measures
What is M40 _ TOR - EQ and B.F.S
What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?
Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam
plumbing CPVC fitting FTE Brass full form
Can compresive strength test for concrete at 1 day age possible to carry out? If yes, which IS code describes the procedure for such testing?
What is the largest concrete dam in the world?
What are the different approaches in designing the floors of the service reservoirs?
1m square 20mm plastering how much of water need curing work
how to calculate number of bitumen for road asphalt
How do you measure water flowing through 300mm diameter pipes?
What are the different types of foundation?
sir, whitch is the best book (writer name) for prepration of gate....