for concrete cubes samples.. what if the 7 days gain the
strength of 42.34 mm/2 and the 28 days only gain the strength
of 37.5 mm/2?
Answer Posted / vikranth geddam
sampling and curing for 7 days might be correct. And for 28 days sampking might not be done correctly and at the same time curing also.
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters
what is the calculation of raw material for 0.35cum of m-15
what is the formula to find the diagonal shape stirrups?
What are the responsibilities of a site manager?
sir i want to know that in L & T construction can we do our 6 months training proggramme cum placement???????
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
what is smart building materials?
Define aligned dimension?
How to calculate material and labor required for 100 m2 plaster?
How much does it cost for a R.C.C cover slab of size (450mmX 600mmx 100mm) double rf net given in feets using hand mix concrete?
What is factor not to be taken in consideration in mix design?
what is concrete canvas?
What is the general specifications of a bituminous pavement road?
Aptitude, reasoning, quants, verbal and technical question