1) One mason per day how many cu.m work will do as per list
given a) Brick work,hollow brick work and cc block work and
plastering how many m2 per day 2) one carpenter per day how
many m2 will do as well as scaffolding how many m3
Answer Posted / rajan pandey
their two ans is right
Is This Answer Correct ? | 13 Yes | 3 No |
Post New Answer View All Answers
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
What is gravity flow?
How much cement is require in one sqft area in a G+3 residential construction.
can you give me the details of rate analysis of steel and concrete?
Reinforcement details at hinged joint
What was asked in isro civil interview
how much used soil in 1 brick of standard size?
rate analysis for cement pointing 1:4 , for 100 sq m
why we are useing plastic under the lean concrete?and whts the advantage?
What is the ideal size of the living room ranges from small to large size?
what is the meaning of degreasing of the euipment or line.
How to take labor charges for construction of 1cum of concrete?
is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.
Define What are the materials used in building a gravity dam?
i have four storeyed rcc building.basement of the building is around 34 years old.it does not have pillar support.it is having lintel steel support at every 7 feet of construction. how long this building will lost long . can any body help me in this regard