1) One mason per day how many cu.m work will do as per list
given a) Brick work,hollow brick work and cc block work and
plastering how many m2 per day 2) one carpenter per day how
many m2 will do as well as scaffolding how many m3

Answer Posted / rajan pandey

their two ans is right

Is This Answer Correct ?    13 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required

1540


What is gravity flow?

683


How much cement is require in one sqft area in a G+3 residential construction.

1594


can you give me the details of rate analysis of steel and concrete?

2466


Reinforcement details at hinged joint

2689






What was asked in isro civil interview

499


how much used soil in 1 brick of standard size?

1571


rate analysis for cement pointing 1:4 , for 100 sq m

3695


why we are useing plastic under the lean concrete?and whts the advantage?

2157


What is the ideal size of the living room ranges from small to large size?

659


what is the meaning of degreasing of the euipment or line.

3306


How to take labor charges for construction of 1cum of concrete?

681


is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.

1577


Define What are the materials used in building a gravity dam?

735


i have four storeyed rcc building.basement of the building is around 34 years old.it does not have pillar support.it is having lintel steel support at every 7 feet of construction. how long this building will lost long . can any body help me in this regard

1870