Answer Posted / tasbeehullahkhan
Sensing of govrner call droop I,e load decrased speed increasing and load increase speed decrease so,accordingly control valves opening ang giving fuel/steam
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.
What is surging in a centrifugal compressor ? How it occur's ? How is antisurging done ?
what is the trip circuit supervision in an electrical meaning?
How to calculate power press toneage
im try to calculating seawater flow required for SW-FGD system. I need a guide, equation or method to do it, can some one help me! Thanks very much
what does mean by kva rating
operation
some one can tell me how residual type excitation is provided through transformers to an AC generator without any battery or PMG&excitor
can dp type level transmitter work in under vaccum condition
what is the meaning of SST300 V56A in SIEMENS turbine
Which will have more strain energy 1.Spring 2.Circular disc 3.Solid square plate.
DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.
how to differentiate between "ALL fuel lost" and "All Fuel Lost" in Boiler MFT condition?
Why superheated are started before I'd and rd fan?
dear sir i have completed one year post diploma certificate in thermal power engineering from national power training institute durgapur ...plz suggest me for power sector job