Answer Posted / obaidhaqmal
We can say it as Pavement Quality Control
| Is This Answer Correct ? | 7 Yes | 0 No |
Post New Answer View All Answers
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
where i can get material costs on weekly basis
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
Calculation of Pier Cap with tapper area?
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
pls give me ans to ACT formula cube testing porpuse
Why Is Propping Required For Long Structures Once The Form Work Is Removed?
How much cement and water required for cement selery????
Pls provide me with the calculation or codes related to de- shuttering of flat slabs
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)
Define current ucs?
what r the precaution for high in atp tempareture,low in atp tempareture
Define a polyline?
Minimum concrete cover in slabs, columns, beams, foundation and other st?