In a coal fired boiler furnace temp. is high but super
heater out let temp. low what reason for this?
Answer Posted / y v subba rao
Final super heater inlet steam temperature is well below than flue gas temperature of that zone(400degrees). Steam travels trough super heater coils with higher velocity(may be 25m/sec) as per the boiler design to meet the steam requirement of turbine. Hence the pretension time of steam is very less in super heater zone. More over there is always a temperature difference across the tube thickness. Due to this reasons super heater out let steam temperature is always much below than flue gas temperature in that zone. However the boiler itself will be designed in such a way.
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.
why airtel use + 24 volts and other operators use -48 volt
We have Demin Closed cooling water system with expansion tank for cooling oil system. Expansion tank having N2 bladder. Whenever N2 bladder bursts out, Closed cooling water circuit pressure drops and make-up happening, eventhough there is no leaks. And how Circuit pressure drops?
im try to calculating seawater flow required for SW-FGD system. I need a guide, equation or method to do it, can some one help me! Thanks very much
dear sir i have completed one year post diploma certificate in thermal power engineering from national power training institute durgapur ...plz suggest me for power sector job
How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.
what is natural frequency of turbine shaft .
By any way can we increase the B check hours from 300 to 500
can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525
How to calculate power press toneage
what's the moog valve
Why superheated are started before I'd and rd fan?
operation
explain how the third harmonic content of the magnetising current affects transformer design
what is the basic use of power plant in equipment