How to calculate sand,cement for 1:5ratio brick masonary

Answer Posted / syed imran

Dear Sandy....I cant understand about 1525....?

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the causes of building collapse?

653


hoe much fine & sourse agregate required for concrete mix of 1: 1.5:3 by volume in Cu.Ft

1401


Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards

1578


how to take concrete quantity for precast segment for viaduct project?

2574


How to calculate the area of a irregular sized land in square feet?and what will be the total area of this land South-51.1ft , North-47.7ft , East-53.3ft , West-54ft ?please explain me how to calculate?

1483






Would you cause a 55-gallon drum of water to weigh more by climbing in?

671


When was the first motorway built in england?

646


What is the exception critarea of cube?

1982


How to determine dia of steel for use in column,slab etc. i mean how to calculate the diameter of steel which is to be used in structures.

1797


Please Clear My doubt . We Can Design the size of the beam by manually by the Length of the beam...What is the technique adopted

1293


I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

1638


The largest size of paper used in plotter to print the drawing made by Autocad .

1294


How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)

1730


What are the responsibilities of a construction manager?

779


design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal

1791