Ihave 230mm *115mm * 75mm brick calculation in cft and 115mm brick calculation in sft
Answer Posted / waseem khan engg
Cft= 1/.230×.115×0.075 = ?
Sq.ft = 1/.230×.115 = ?
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
A doubly reinforced concrete beam is 25 cm wide and 50cm deep to the centre of tension reinforcement. The centre of compression is steel is 5cm from the compression edge. The areas of the compression and the tension steel are 10.16cm2 and 12.56 cm2 if m=18 and the bending moment at the section is 7,000,000 N-cm. Calculate the stress in concrete and steel.
what is smart building materials?
A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals
In csae of hume pipes NP stands for Non Pressure bur what does it really mean?
what is tension footing?
Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.
What things architect have to take care of before starting any project?
what is the weight of 10mm,20mm,40mm aggregate
what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)
What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??
What is unit weight of roadway layer.. 1.bitumen 2.sand 3.soil 4.concrete 5. aggregate give me some reference for this answers
What is Grid floor and mention its advantages ?
1.Fe500 and Fe550 having more yield strength than Fe415.But why are we prefering Fe415.? 2. d^2/162 formula for knowing the steel wt/m apply all these three? Thanks.
1)What is the total volume of aggregates required for 1cu.mtr.solid hard concrete? 2)What is total mass of wet concrte and dry concrete after 28 days of M25? 3) Is 28 days strength is the final strength of concrete or it gets increasing as the time period increses.? 4)What is the volumetric proportion of concrete grade of M25.M30,M35,M40
what is w/c ratio in dry lean concrete for m10 mix design