11KV electrical line going through the forest in cloudy night ,how can we find the direction of line.
Answer Posted / nizam
by seeing violet colour due to corona effect
Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
In both 600/1000 V cable and 450/750 V cable, we can supply 415 V. However for distribution, all utilities are using only 600/100 V instead of 450/750 V. What is the reason?
CAN U PLEASE TELL ME SOME G.D TOPICS FOR APGENCO INTERVIEW&G.D
bsec exam syllabus (mis)
what is the VA(Volt-amphere)? define with calculation?
ratings of lightning arrester
Dear all i am kumaravel. now in chennai. my work is control and relay panel auto cad designing.up to 11kv to 400kv then question is i am improving my knowledge. i want some books name and auther are available for this C&R panel related. plese any one help me
What would cause a 240v choke that should give 110v out on a 16w lamp to gradually increase to 160v?
does a DG set has low fault level as compared to that of a transformer.If yes then why.
What is the transfer function?
What are your future plans for the company if permanently employed?
how synchronous condenser is used in place of synchronous generator with out negotiating IEEE standards? Can i use 3 generators as synchronous generators and 2 generators as a synchronous condensers in an IEEE 14 bus system with out disturbing the standards?
Write the analogous electrical elements in force voltage analogy for the elements of mechanical translational system.
I am using submission of two ct in one and half scheme for 67/67N protection. Both CTs star point is grounded separately near ct box.Will two point ground give wrong tripping to 67/67N during fault or no matter.
how make megger test for control cable like 12c x 1.5mm and what it apply voltage and test timing details.
3 shows a 415 V, 3-phase generator supplying a 3-phase 415/110 V transformer. Draw the individual and combined impedance diagrams to a base of 10 kVA. Determine the system fault kVA and the fault currents at the 415 V and 110 V busbars for short circuit faults on the transformer input or output terminals. Work in p.u. values of impedances.