Answer Posted / rupesh kumar sahu
Quality of concrete can be checked by CTM AFTER 28 dYs curing.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
length where bent up is made in slab of bridge from one end
What is the diff between cad & cadd?
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
what should be the PCC ratio to construct a plinth of (40x40x4)ft...??also its estimated cost??
how to stop beam concrete between column
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
What tor stands for in tor steel?
how to create our resume?
how much repeitation for conventional and maivan formwork?
Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire
What is the diameter of the 3"inch nails?
What is soil enforcement?
a butt weld is specified by
flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force
How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?