Answer Posted / gopal
Tested cube strength/Standard strength required * 100
Example :
Grade 20 concrete cube
Tested cube result after 28 days = 30n/mm2
Design strength after 28 days = 20n/mm2
30/20x100 = 150%
Is This Answer Correct ? | 10 Yes | 4 No |
Post New Answer View All Answers
What Are The Steps Involved In The Concreting Process, Explain?
What do you mean by honeycomb in concrete?
How to determine spacing of bars in slabs or beams
How to calculate density of 40 mm coarse aggregate, in mixing ration 1:1.5:3? Please explain calculation for density
What are the responsibilities of a construction manager?
What is Base Shear ?
Why should pumping be not used in case of concreting work?
what does the track parameter mean in staad.pro?
"how can we find the approximate quantity of materials using in a building or total Expenditure in percentage for rough estimate after known the construction area(sqm)".please if you know something about that please post the answer.
qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor
within an emergency scenario what are the safe systems of work a coss can setup as part of is duties
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
Dear sir, i want to NBCC & NTPC previous exam papers email Id : madhu_bingi@yahoo.co.in
What in bending moment, if a moment is free end of cantilever beam?
While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?