Why is DPC not provided at sills of doors?
Answer Posted / sulipto09@gmail.com
Dpc is used for protect from damp, as in door position brick work is not provide for opening, for this DPC is not Provided.
Is This Answer Correct ? | 11 Yes | 2 No |
Post New Answer View All Answers
How to calculate the force on a column of three story building. What should be the base concrete height?.
Explain what is alternate bid?
what is the anchorage length of reinforcement.
What is structural frames or systems?
how to preaper for interview wat they asked in interview give me idea
What is the maximum strength of cub compress strength in one cub testing
how to calculate reinforcment in staircase cranked beam?
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing
How do you measure concrete?
Explain the Strength of brick?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above
Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?
we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level