what are the steps of syncronizing the generator with an infinite grid?
Answer Posted / sarang
we have match our voltage freq. and phase angles with the grid values only then we synch,
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
LAPT working in alternator / generator
How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.
We have Demin Closed cooling water system with expansion tank for cooling oil system. Expansion tank having N2 bladder. Whenever N2 bladder bursts out, Closed cooling water circuit pressure drops and make-up happening, eventhough there is no leaks. And how Circuit pressure drops?
Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon
procedure of how to generate power in solar plant.
how to differentiate between "ALL fuel lost" and "All Fuel Lost" in Boiler MFT condition?
why do you consider yourself a suitable candidate for this position
What is surging in a centrifugal compressor ? How it occur's ? How is antisurging done ?
can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525
some one can tell me how residual type excitation is provided through transformers to an AC generator without any battery or PMG&excitor
why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.
Why superheated are started before I'd and rd fan?
By any way can we increase the B check hours from 300 to 500
what does mean by kva rating
what is restricted earth fault explain in details