what type of drawing used in the field construction?
Answer Posted / chandrakantha
Used construction field preliminary drawing
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
what is spacing of wallar support of 3m column. the thickness of column is 0.25 m.
plumbing CPVC fitting FTE Brass full form
what is zone a n zone b?why the spacing of ring in zone a less.n zone b high?
for 32 dia (EQR HYSD steel) bar how much deduction for 45 and 90 degree band
Can compresive strength test for concrete at 1 day age possible to carry out? If yes, which IS code describes the procedure for such testing?
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
please what is the number of bars required for a column of 6mx6m and 450mmx300mm,its a commercial building (Church)
What is c.g.i sheet which used for roof??
suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?
how to find ssm in foundation?
For fine aggregate which is most suitable River sand or crusher sand & why ?
GIVE US YOUR FULL DETAIL OF THE FOLLOWING… FULL NAME.. PERMENENT MAILING ADDRESS DIRECT CONTACT NO E MAIL ADDRES.
when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982