1 bag of cement how much cubic meter?

Answer Posted / jumma

on average one seventh 1/7 m3 ( 50kg bag)
the cubic meter of concrete requires around 350 kg of cement.

Is This Answer Correct ?    0 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Define polar co ordinates.

710


what is the difference between replacement of cement by groundnut shell ash

2510


std penetration resistance in very stiff clays lies bet 2 & 4 4 & 8 8 & 15 15 & 30

1609


what is the steel difference between np-2 and np-3 pipes and weight also

1685


What is the difference between one-way slab and two-way slab?

666






How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton

1700


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

1677


how we calculate the grade of the Bituminous materials.?????

1829


How to calculate Volume of Wet cement concrete for a specific grade?

1773


Design a rectangular channel.

2464


How long does it take concrete to harden?

668


I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.

2053


cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate

1206


As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.

1493


Explain what are the phases inspections are done by local authority while construction?

746