How many layers in 12mm and 18mm plywood?
Answer Posted / shreekantabehera2@gmail.c
12Mm 6 layer
18Mm 9 layer
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
acceptance criteria for concrete works
What is the cemnent ratio
Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?
what is the difference between replacement of cement by groundnut shell ash
is basic cost of the material includes tax?
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
How can you achieve soil enforcement?
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
Why should pumping be not used in case of concreting works?
need to join coaching institute in coimbatore tamilnadu ......say me the best coaching for IAS
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
Which are the top apps for you civil engineering?
qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor
though u r a civil engineer, y r u interested in tcs???
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?