what is the problem not getting 7 days slab cycle in Mivan
formwork? what is the output of mivan carpenter per day?

Answer Posted / abhijit machale

Mivan shuttering output per day

Is This Answer Correct ?    8 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)

1663


Define unit atmospheric pressure? Difference between gauge pressure, absolute pressure?

1684


Name the main components of a cad gui?

1040


What things architect have to take care of before starting any project?

751


What are the advantages of cad software’s?

682






Draw the cross section of a boundary wall and label its part with detailing?

4150


what pressure the NP2 class RCC pipe can sustain?

2214


How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?

1044


What are the advantages of cad?

643


how u design STAGING for Superstructure in BRIDGE construction?

1894


give me the mix proportion for design mix concrete M 7.5 grade 1:4:8

3608


how water proof chemicals act in concrete to avoid leek?

1771


may i know the detailed description of cutting length

1637


strength vs shape factor

2130


 Describe a time when you anticipated potential problems and developed Preventive measures

2810