what is the problem not getting 7 days slab cycle in Mivan
formwork? what is the output of mivan carpenter per day?

Answer Posted / abhijit machale

Carpentor per day output

Is This Answer Correct ?    4 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is tension & compression of steel bending.

1840


What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.

1567


how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing

1830


pile load testing procedure

1751


Basic questions of civil engineering

1620






in 100 cft = 1350 bricks in 100 cft = ? bloks

2387


Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.

700


1.Fe500 and Fe550 having more yield strength than Fe415.But why are we prefering Fe415.? 2. d^2/162 formula for knowing the steel wt/m apply all these three? Thanks.

2715


Time required for curing of wall tiles before fixing

1773


A super elevation of 60 cm has been provided on a 8m wide road and a curve of 260m radius .calculate the max.speed in km/hr of the vehicle that can be negotiated safely? Plz answer with full solution.thanx

1357


Explain the water bound macadam roag

2257


how to absorb to site basic corrections? which are the important correction?

1003


Actually i am confused that how to calculate the bending moment for a semi-circular beam and curved slab.If any one have a good idea about the matter,please give the answer with a suitable example. Thank you......

1735


What is the use of array command?

697


what is the use of beam end forces while using a staad ? wha they are show

2476