If the first roof slab is not deshuttering in this time shall I start column raising work in second roof is it correct or not
Answer Posted / surajitg
Yes from the very next day you can start work over the roof for the next floor. Provided you take care of the newly concreted surface from getting damaged and water ponding for proper curing.
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
how to prepare site mix design
pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer
how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar
How about the temperature of grade 35A concrete? Does it depend on the ambient temperature?
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
Basic civil interview questionsÂ
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
What in your past experience or education prepares you for the position for which you are applying
What is the ratio of grades m5, m7.5, m10, m15, m20, m25, m30, m35, m40?
show answer/calculate mix 1:2:4 ratio -cement-sand -metal-water
what is called the inverd level of mabhole chamber?
can i make bricks using M10 grade concrete ? and what would be the cost of a brick if we use m10 grade concrete sand and aggregates ??
How do we calculate absolute pressure?
How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)