plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work
(1sqM)?
Answer Posted / p jagan
Rcc 1cft rate is 250/- in kurnool I want PCC rate 1 4 8ratio
Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
how to determine H- zone in a column? where it will occur?
HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS
What are the strongest shapes in building?
What is difference between combin footing & rapt footing
What is the minimum size of the particles of silt soil?
why is the column design?
How to calculate quantity of cement , sand and granite from concrete mix ratio and volume of work
What is the cemnent ratio
How do you compute volume of airflow?
Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.
How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members.
Is it worthwhile to carry out tests on particle density of soil particles for geotechnical design?
For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38
How to do base isolation using ETABS software?
How to calculate plastering for elevated water storage tank