Answer Posted / muhammad azam
Smaller dia bars are provided in the compression zone of the beam to anchor the vertical stirrups is called anchor bar or holding bar.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Dear Frds, How can i calculate the Steel for RCC Slab, Please provide one Example also, so that i can understand very well. Ex: Area: 1320.0 Sft.(44' X 30') Span: 15'(Default). Column Size: 9"X15"(6 No.s 12mm Rods) Please Provide Calculation Details. Thankyou. Satish
What is the method of soil replacement test?
how to calibrate the RM 800
pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer
residential buildings,mixing of concrete,structural,construction material,site handling.
How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.
who to find building iron rod strenth
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
What are moment of inertia and its importance in civil engineering?
what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??
Civil engineering related
if we use 1.25 bag of cement 3 pharma metal and 2 pharma crush sand what is the strenghtexpected for RCC column