how to calculate circular slab reinforcement
(6m dia 0.15mmthick)

Answer Posted / karam chand gupta

The reinforcement in a circular slab can be calculated by formula:

L = A/2s
Where L = Total length of steel bar in m (to be found out)
A = Area of the circular slab/mesh in m
s = Spacing of steel on both directions in m

Is This Answer Correct ?    31 Yes 12 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.

1676


Hi how r u ? hope you are fine there . Please can u tell me tha Design life of Buildings as Per ACI CODE 318-99. It will be a pleasure for me .Thanks in advance

2157


How to find the cuplock pipe qty in staging for Minor bridge?

727


while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.

1217


how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?

1539






what is the cost difference of a same structure when it is constructed with brick masonary and when it is constructed with block masonary and concrete as a frame structure????????????????????????

1632


Explain the Strength of brick?

666


Describe Briefly The Various Methods Of Concrete Curing?

681


Sometimes the side of concrete bridges is observed to turn black in color. What is the reason for this phenomenon?

703


How do we test on design and style in a software?

681


What are the advantages and disadvantages of lead products in construction?

744


what is m30 in concrete tiles

1898


I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

1649


how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6

5801


The largest size of paper used in plotter to print the drawing made by Autocad .

1306