Answer Posted / sahilshah.civil@gmail.com
As per IS 7861 (part I) - Hot weather concreting - Temp more than 40 degree Celsius.
As per IS 7861 (part II) - Cost weather concrete - Temp below 5 degree Celsius.
Normal Temperature between 5 degree to 40 degree Celsius.
Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3
how much need cement bags for block work of wall approx 1000 hollow blocks 20x20x40cm
Define What is the distance between railway tracks?
what is the formula to find the diagonal shape stirrups?
What is the density of DLC & PQC and how it is differ from normal concrete?
Define What are the uses of Groynes?
what is a well
WHAT R THE GENERAL TECH QUESTIONS ASKED FOR THE INTERVIEW FOR AN AUTOMOBILE INDUSTRY,SPECIALLY DESIGN DEPT
How to Calculate Materials Required for PCC 1:4:8 for 1Cum & Brickwork 1:4 for 1Cum & Plastering 1:4 (15mm Thick) for 100Sqm & RCC 1:4:8 & 2mt ( L1=1mt & L2=1mt ) length of 12mm Steel bended in 90degrees what is the formula to calculate Weight & Actual Length ?
Define Workability ?
Describe Briefly The Various Methods Of Concrete Curing?
Which condition will prevail for the design of a swimming pool ? When the pool is empty or when it is filled ?
Scaffolding IS code NO.
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
what is diversion?