what is water cement ratio and how to calculate it after
designing the concrete?
Answer Posted / sahilshah.civil@gmail.com
Water cement ratio is fixed at the time of design mix of concrete.
It's Depend on following condition.
a) Environmental
b) Type of structures
c) Method of casting
d) Admixture
e) Material
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Which architectural movement is also known as jazz moderna?
how to find out hard strata in bored pile when the DMC method adopted.
What is OSHA compliance?
what is the most suitable foundation when construct a bird watching tower in a marshy land
What is meant by autocad?
While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?
how to calculate steel for slab or footings?
what is the minimum compressive strength of clay brick
What are the basic use of runners and standards of pipelines?
what is idealized curve for concrere and steel
how to control PQI (Project Quality Index)
How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?
Need help in designing a degasser tower for 2m3/hr DM plant, also send me the formulae used
In jack arch floor, the rise is kept?
what is directivity effect?